増田淳氏関係資料 設計計算書
86. 下関市昇開橋・跳開橋 (PDF/8.3MB)
| 通番 | File | page | 標題 | 内容 | 設計 | 照査 | 用紙 | 備考 | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 名前 | 日付 | 名前 | 日付 | 社印 | 罫線 | 紙質 | ペン | ||||||
| 1 | - | - | 下関市昇開橋 跳開橋 概算設計 | 表紙 | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 2 | - | @ | 下関彦島 バスキュール橋 | 設計条件 | K. I. | 19360418 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 3 | - | @A | - | Side span, Live Load moment | - | - | - | SN | 無地 | 普通 | 鉛筆 | ||
| 4 | - | @B | - | Dead Load, Summary | - | - | - | - | SN | 無地 | 普通 | 鉛筆 | |
| 5 | - | @C | - | Side span, Center girder section, Summary for structural steel in fixed span |
- | - | - | - | SN | 無地 | 普通 | 鉛筆 | |
| 6 | - | 2 | 下関 | Live Load, Summry | K. I. | 19360422 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 7 | - | 3 | - | Main bascule girder | K. I. | 19360423 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 8 | - | 4 | - | Balancing Link, Counterweight required | K. I. | 19360423 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 9 | - | 5 | - | Balance girder, Counterweight tower, Summary of structural steel | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 10 | - | 6 | 20m Bascule span | Estimate of Operating power | - | 19360423 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 11 | - | 7 | 20m Bascule | Estimate of Cost | K. I. | 19360423 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 12 | - | 8 | 20m Bascule span | Substructures, Basucule Abutment | K. I. | 16360424 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 13 | - | 9 | 20m Bascule | Pier between fixed and bascule span | K. I. | 16360424 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 14 | - | 10 | 下関市彦島町連絡道路跳開橋 (20m clear span) | Estimate of Cost, Superstructures, Substructures | K. I. | 16360424 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 15 | - | J | 彦島連絡可動橋用遮断機 | 遮断機図面 | - | - | - | - | 無 | 無地 | 普通 | 鉛筆 | 白紙 |
| 16 | - | K | - | Cross section of bridge | K. I. | 16360418 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 17 | - | L | - | Floor beam, Design of main girder | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 18 | - | M | - | Total weight of moving span | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 19 | - | N | - | assumed weight of moving span | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 20 | - | O | - | Design of tower | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 21 | - | P | - | structural steel for side span, Total weight of structural steel | - | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 22 | - | Q | - | Pavement, Concrete slab, Planting, Concrete floor for machinary & operating room |
- | - | - | - | SJ | 方眼 | 普通 | 鉛筆 | |
| 23 | - | R | - | Cut sheave | - | - | - | - | SN | 無地 | 普通 | 鉛筆 | |
| 24 | - | S | 下関市 20m Lift Bridge | Estimate of Cost | K. I. | 19360504 | - | - | SJ | 方眼 | 普通 | 鉛筆 | |